MICROMS4 Image Release History
Version Release Date   Changes
       
6.04.22 5/4/2021 1.Supported Different Ranges of Foxboro Sensor
   
6.04.21a 7/27/2020   1. Added Delay Timer for Polling a Slave Unit. 
       
6.04.21 5/30/2018   1. Reset Turbine Offset at Startup
       
6.04.20 5/11/2018   1. Added Foxboro Transmitter Interface
  2.  Increased Timer for A/D Converter (Analog Inputs)
       
6.04.19 10/16/2017   1. Added NIST10-Superheated Steam
  2. Adjusted Timer for A/D Converter
       
6.04.18 11/2/2016   1. Corrected Energy Flow Calculation (Metric Units)
       
6.04.17 12/2/2015   1 .Added Calorific Calculation
       
6.04.16 9/1/2015   1. Modified Multivariable Data Dump Routine 
       
6.04.15 8/16/2015   1. Added Mutivariable Data Dump
       
6.04.14 9/9/2013   1. Corrected Analog Input#3 Reading
       
6.04.13 7/16/2013   1. Set Turbine Meter (GAS) to Liquid Meter Application if Composition Flag is Configured
       
6.04.11 4/30/2013   1. Modified Communication Routine
  2. Reset Flow Averaged Value if a New Flow Calculation Method is Applied.
  3. Set Less Sensitivity Default Value for the Display Keys
       
6.04.10 3/15/2013   1. Reduced Sdevice Timer
  2. Implemented API 2004 Crude Volume, Set Ct,anp to CTPL
     and set Base Density to Density@15 (Metric Units)
  3. New Display Contrast Initialization
  4. Display Analog Input Maintenance/Live Value without Setting High Limit (Fail Code=2)
  5. Set Double Write to Download Mode via RS232 Port
       
6.04.09 10/25/2012   1. Modified Communcation Routine
       
6.04.08 6/1/2012   1. Added Accelabar Equation
  2. Added Venturi Equation
  3. Correction AGA7 - Mass Flow
       
6.04.07 12/16/2011   1. Correction - Poll Meter#2,#3, and #4 Historical Reports
  2. Allowing Zero Based Temperature 
       
6.04.06 2/20/2011   1. Activated Slave Port and Digital In/Output#4 (Model 2009 or Newer Board)
       
6.04.05 4/28/2010   1. Added ISO 6976
       
6.04.04 3/31/2010   1. Modified Reset Routine
       
6.04.03 1/29/2010   1. Added Rosemount Meter Type
       
6.04.02 9/16/2009   1. Modified Display Initialization
       
6.04.01 5/29/2009   1. Addeed Pitot Tube Equation
  2. Added Modbus 2370 (1=New Hardware)
       
6.04.00 3/25/2009   1. Addeed Support for Old and New Hardware Units
       
6.03.16 3/6/2008   1. Modify Audit Trail Routine
  2. Correction - Read Analog Input Expansion Configuration 
       
6.03.15 11/14/2007   1. Correction - Reset Test Data - No Flow
       
6.03.14 5/2/2007   1. Add - Gravity Factor and Base Density Factor
  2. Correction - Verabar Equation - Mass and Energy Flow Rate
       
6.03.13 1/23/2007   1. Correction - Daily FWA BS&W
       
6.03.12 1/8/2007   1. Modify Display Sensitivity Key Routine
       
6.03.11 7/21/2006   1. Add BS&W Input Option
       
6.03.10 11/4/2005   1. Correction - Update Analog Output mA Value
       
6.03.9 4/29/2005   1. Add - Verabar Flow Equation for Gas and Liquid Application
       
6.03.8 3/16/2005   1. Add - Daylight Saving Time Option
  2. Add 16 Bits Month, Day, Year, Hour, Minute, and Second Registers
       
6.03.7 12/1/2004   1. Enable/Disable Front Panel Scan Key
  2. Add Turbine Diagnostic Data
  3. Add Calibration Parameters to be Part of the Configuration Software
       
6.03.6 10/8/2004   1. Modify Modbus Shift Routine
  2. Modify Program Variable Statements and Boolean Statements Routine
       
6.03.5 9/2/2004   1. Add Gas Composition Selection
  2. Add TPU Frequency Counters
       
6.03.4 6/10/2004   1. Add Battery Voltage Reading 
       
6.03.3 5/21/2004   1. Correction - Broadcast Command
       
6.03.2 5/18/2004   1. Correction - Update Gas Composition for All Meters On Snapshot Report.
  2. Correction - Liquid Meter Using AGA7 Method
       
6.03.1 4/29/2004   1. Correction - Analog Output Display mA
       
6.03.0 2/20/2004   1. Add 485 Port#2 or Digital Output#4 Option
  2. Correction - Slave ECHART or MICROMV Message Initialization
       
6.02.9 1/21/2004   1. Correction - Update Gas Composition of Snapshot Report if G.C. is configured.
   
6.02.8 1/2/2004   1. V-Cone Fow Equation - Add Y Factor Selection, Cone Thermal Coefficient
       
6.02.7 12/2/2003   1. Correction - AGA7 Mass Calculation
       
6.02.6 11/18/2003   1. Correction - Modbus IEEE Floating 2 Registers per One Variable (No. of Variables)
       
6.02.5 10/27/2003   1. Set ROM/RAM Wait State to 1
       
6.02.4 9/8/2003   1. Add Three Frequency Inputs Selection - AGA7 
       
6.02.3 8/28/2003   1. V-Cone Calculation -  Add Pipe and Cone Thermal Coefficient 
       
6.02.2 7/24/2003   1. Correction - Write Modbus Floating Point 2 Registers 4 Bytes Variables 
  2. Improve Real Time Clock Accuracy
       
6.02.1 7/15/2003   1. Add BS&W Override
  2. Add Natural Gas @20 Deg.C Flow Equation
  3. Add Liquid Crude Volume to 20 Deg.C Equation
       
6.02.0 4/23/2003   1. Add Data Verification/Calibration Report
       
6.01.9 3/7/2003   1. Correction - Update Liquid AGA7 Meter Factor and Frequency Data
       
6.01.8 3/3/2003   1. Reset Slave Variables If Slave ID Is Changed Back To Zero.
  2. Default Display Timer to 4
       
6.01.7 2/25/2003   1. Add Gas/Liquid Application Selection (Liquid - Table 24A, API 11.2.1) 
  2. Add 4 Slaves-ECHART Interface
  3. Modify Foxboro Interface and calculation
       
6.01.6 1/22/2003   1. Add 2368 IEEE Floating Point Modbus Selection 0=One 32 bits, 1=Two 16 bits Data
  2. Add 2368 IEEE Floating Point Modbus Sequence 0=HI,LO 1=LO,HI Bytes
  3. Add 7352 Day Start Hour
  4. Add Security Code Variables for the Window Program.
  5. Modify Foxboro Interface and calculation
       
6.01.5 12/27/2002   1. Add Foxboro Interface
  2. Correction - Data Entry Through Front Panel Display
       
6.01.4 12/19/2002   1. Normalize AGA8 Composition Percentage. (Acceptable Data Range 98-102) 
  2. Add Gas or Liquid Application
  3. Add Flowing Density Override Entries
  4. Add Station Total Selection
  5. Correction - Program Variables
  6. Add Historical Data - Program Variables
  7. Enable PID Routine
  8. Add Previous Day's Gross, Net, Temperature, Pressure 32 Bits Integer Modbus Registers
       
6.01.3 10/23/2002   1. Add Spare Data - RTD 
       
6.01.2 10/18/2002   1. Special Project - Test Data
       
6.01.1 9/20/2002   1. Add New Data Entry - "Frequency I/O Postion Selection"
  2. Add "Test Data"