Gas Lift Optimization using E-Chart Flow Computer
Objectives
To provide the client with real-time and accurate monitor measurements for gas lift operation.
Solution
Geo Southern installed E-Chart Flow Computers at the Oro Negro refinery location on its gas lift operation. The meters were installed in a flowing/live condition resulting in no need to shut down the pipeline during installation/retraction operation.
Value to Client
- The E-Chart meters provided the client with continuous and accurate Gas measurements.
- The meters significantly provided the client with a cost-effective hot-tap installation method by eliminating shutdown or deferred production.
- With the integration of flow computer, monitoring total Gas production for entire wells allowed the client to optimize and proactively manage the Well production based on real-time data
Client
GEO SOUTHERN
Location
Westhoff, TX
Field
ORO NEGRO
Well Type/Application
Gas Lift Optimization
Product/Service
E-Chart Flow Computer
Flow Rate
100 – 400 MMSCFD
Primary Element
Orifice Plate